Purpose of the project
Determination of the required number of measures for the development of the railway infrastructure of the Eastern polygon of the Russian Railways network for the development of prospective cargo traffic, as well as optimization of the technological process of organizing transportation on the sections of the Eastern Polygon for the period up to 2025.