In Krasnoyarsk, as part of the implementation of the project for the target structure of locating fuel warehouses of RZD JSCo, a network school of best practices was held. The topic was “Best practices and advanced technologies for improving the safety of production processes in material and fuel warehouses.”
Anatoly Chabunin, Deputy General Director - Director for Internal Control and Audit of RZD JSCo, Irina Mitichkina, Head of the Central Directorate of Procurement and Supply (CPS) and Maxim Rachkovsky, Chief Engineer of the Directorate, Roman Kukishev, Chief Engineer of the Krasnoyarsk Railway, and representatives of TsOTEN, TsTEKH, TsEU, TsRI, TsT, TsD, NIIAS, IEDT participated in the work of the network school.
Representatives of regional supply directorates from the entire road network spent two days, dividing into four working groups, discussing the issues of determining locations and equipment options for rolling stock and the state of labor safety conditions in fuel and material warehouses. The result of the event was the final protocol, which formulated a list of proposals from the chief engineers of the supply directorates on the formation of the technological process for the operation of fuel depots.
The full text of the article can be found on the website Gudok.